In 2023, our company carried out the renovation project for Sanmen Hospital in Zhejiang. Compared with traditional boilers, the project has achieved remarkable energy-saving results, with annual energy cost savings reaching one million yuan.
Basic Project Information
The original system used steam boilers to meet the hospital’s needs for disinfection, heating, and domestic hot water, which was characterized by high energy consumption and poor efficiency. Our company replaced the original integrated system with different energy supply solutions for respective needs: hot water boilers for heating, air-source heat pumps for domestic hot water, and the existing boilers retained exclusively for disinfection. This approach enabled precise control of energy consumption in each area.
In 2024, the total energy cost savings from the project amounted to more than 1.1 million yuan.