2026-01-16 27

Over 50% of energy-saving renovation projects!

In 2024, our company implemented the energy-saving renovation project for Jinhua People's Hospital in Zhejiang. Compared with traditional vacuum hot water boilers, the project has achieved remarkable energy-saving results, with annual energy cost savings reaching over 1 million yuan.

Basic Project Information

The original system used vacuum hot water boilers to meet the hospital’s needs for heating and domestic hot water. Due to the mixed use of a single system for both purposes, there were issues such as repeated heat exchange, high energy consumption, and low efficiency.


Targeting these different needs, our company replaced the original system with differentiated energy supply solutions: hot water boilers for heating, and air-source heat pumps for domestic hot water. This solution enabled precise control of energy consumption in each respective area.


In 2024, the total energy cost savings from this project amounted to more than 1.5 million yuan.



WhatsAppWhatsApp
MessengerMessenger
E_mailMail
Inquiry